Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Log into Skillsbase > Maintenance > Questionnaire Maintenance

  2. Select Broadbean Integration Logs



  3. Enter Date criteria of failed batch in the Imported Date From and Imported Date To fieldsĀ 

Info
The Imported Date To field needs to be extended out one day after the batch date you require. Eg, If the failed batch dateĀ is 30/01/2018 the Imported Date To needs to be 31/01/2018

4. Select the Search Broadbean Integration Logs Icon

5. Locate the batch that needs to be re-imported and select the re-import icon

...